Part 192 Transportation of Natural and Other Gas by Pipeline:
Subpart M - Maintenance
192.703; General
192.705; Transmission Lines - Patrolling
192.707; Line Markers for Mains and Transmission Lines
192.709; Transmission Lines - Record Keeping
192.711; Transmission Lines - General Requirements for Repair
Procedures
192.713; Transmission Lines - Permanent Field Repair of Imperfections
and Damages
192.715; Transmission Lines - Permanent Field Repair of Welds
192.717; Transmission Lines - Permanent Field Repair of Leaks
192.719; Transmission Lines - Testing for Repairs
192.721; Distribution Systems - Patrolling
192.723; Distribution Systems - Leakage Survey
192.725; Test Requirements for Reinstating Service Lines
192.727; Abandonment or Inactivation of Facilities
192.731; Compressor Stations - Inspection and Testing of Relief
Devices
192.739; Pressure Limiting and Regulating Stations - Inspection
and Testing
192.741; Pressure Limiting and Regulating Stations - Telemetering
or Recording
192.743; Pressure Limiting and Regulating Stations - Testing
of Relief Devices
192.747; Valve Maintenance - Distribution Systems
192.753; Caulked Bell and Spigot Joints
192.755; Protecting Cast-Iron Pipelines
192 Appendix D; Criteria for Cathodic Protection and Determination
of Measurements
Index of Interpretations
|