
Regulations & Interpretations

OPS Interpretations
The following documents appear as Adobe portable document format (PDF) files. Adobe provides a free PDF document reader that can be used to view
or print PDF files. If you wish to save the pdf file in your hard drive, right click the link and "Save link as". Learn more about the
Adobe Reader and how to download it.
Part 192 Transportation of Natural and Other Gas by Pipeline: Subpart H - Customer Meters, Service Regulators, and Service Lines
192.353; Customer Meters and Regulators - Location
192.355; Customer Meters and Regulators - Protection from Damage
192.357; Customer Meters and Regulators - Installation
192.359; Customer Meters and Regulators - Operating Pressure
192.361; Service Lines - Installation
192.363; Service Lines - Valve Requirements
192.365; Service Lines - Location of Valves
192.371; Service Lines - Steel
192.375; Service Lines - Plastic
192.379; New Service Lines not in Use
192.381; Service Lines - Excess Flow Valve Performance Standards
Part 192 Transportation of Natural and Other Gas by Pipeline: Subpart I - Requirements for Corrosion Control
192.451; Scope
192.453; General
192.455; External Corrosion Control - Buried or Submerged pipelines Installed after July 31, 1971
192.457; External Corrosion Control - Buried or Submerged pipelines Installed before August 1, 1971
- July 1998
- October 1996
- July 1993
- March 1989
- March 1983
- January 1983
- June 1982
- September 1979
- August 1979
- December 1978
- November 1978
- January 1978
- December 16, 1977
- December 13, 1977
- November 1977
- May 1977
- March 28, 1977
- March 11, 1977
- December 28, 1976
- December 1, 1976
- November 1976
- September 17, 1976
- September 15, 1976
- September 14, 1976
- September 10, 1976
- September 10, 1976
- September 10, 1976
- September 2, 1976
- August 2, 1976
- July 20, 1976
- July 20, 1976
- July 16, 1976
- July 12, 1976
- July 8, 1976
- June 23, 1976
- July 10, 1976
- May 1976
- April 1976
- March 1976
- January 30, 1976
- January 7, 1976
- August 1975
- July 23, 1975
- July 8, 1975
- July 7, 1975
- May 1975
- January 21, 1975
- January 9, 1975
- July 1974
- May 1974
- December 1973
- January 1973
- September 1972
- August 1972
- July 1972
- June 1972
- February 1972
- August 1971
- July 1971
192.459; External Corrosion Control - Examination of Buried Pipe when Exposed
192.461; External Corrosion Control - Protective Coating
192.463; External Corrosion Control - Cathodic Protection
192.465; External Corrosion Control - Monitoring
192.467; External Corrosion Control - Electrical Isolation
192.469; External Corrosion Control - Test Stations
192.473; External Corrosion Control - Interference Currents
192.475; External Corrosion Control - General
192.479; Atmospheric Corrosion Control - General
192.481; Atmospheric Corrosion Control - Monitoring
192.483; Remedial Measures - General
192.485; Remedial Measures - Transmission Lines
192.489; Remedial Measures - Cast Iron and Ductile Iron Pipelines
192.491; Corrosion Control Records
Index of Interpretations
|