NTSB Closed Pipeline Safety Recommendations:

 

Rec. No. Issue Date Reference

Technical Category

 NTSB Recommendation

NTSB Classification Actions and Actions Taken by Lead Agency

Actions Needed

Correspondence History
PHMSA/NTSB

P-01-01 issued
06-22-01

South Riding

Damage Prevention

Require gas utility operators to maintain a specified minimum separation distance sufficient to protect against both thermal and mechanical damage, between plastic gas service lines and underground electrical facilities whenever they install a new gas service line or perform maintenance on existing lines.

CLOSED-
Acceptable
action

CLOSED
02-17-04

04-23-02

07-16-01

04-15-04

02-17-04

P-02-01
issued
08-02-02

Chalk Point

Pipeline Technology

(Wrinkle Bends)

Establish quantitative criteria, based on engineering evaluations, for determining whether a wrinkle may be allowed to remain in a pipeline.

Open – acceptable response . Study on wrinkle bends completed. Final report issued in May 2003. PHMSA plans to post criteria on its website. PHMSA has submitted a closure letter to NTSB.

Closed
11-28-06

08-07-06

08-06-03

12-10-02

11-28-06

09-30-03

02-05-03

P-02-02 Issued
08-02-02

Chalk Point

Damage Prevention

Require pipeline owners and operators to provide follow-up telephone updates to the National Response Center when they discover that the information they initially reported contains significant errors or when they identify significant new information directly related to the reporting criteria.

CLOSED -
Acceptable
action

CLOSED
12-01-02

08-26-02

12-10-02

 

P-02-04 issued 10/11/02

Bellingham

Pipeline Technology

(Relief Valve)

Develop and issue guidance to pipeline operators on specific testing procedures that can be used to approximate actual operations during the commissioning of a new pumping station or the installation of a new relief valve and determine during annual tests whether a relief valve is functioning properly.

CLOSED-
acceptable action

 

CLOSED
05-03-06

 

08-23-05

08-28-03

11-21-03

05-03-06

P-02-05 issued
10-11-02

Bellingham

Pipeline

Technology

 

(SCADA)

Issue an advisory bulletin to all pipeline operators who use supervisory control and data acquisition (SCADA) systems advising them to implement an off-line workstation that can be used to modify their SCADS system database or to perform developmental and testing work independent of their on-line systems. Advise operators to use the off-line system before any modifications are implemented to ensure that those modifications are error-free and that they create no ancillary problems for controllers responsible for operating the pipeline.

CLOSED-
acceptable action

CLOSED
03-03-04

12-23-03

03-03-04

11-21-03

P-03-01 issued 02/27/03

Carlsbad

Pipeline Technology

(Internal Corrosion)

Revise regulations to require that new or replaced pipelines be designed and constructed with features to mitigate internal corrosion.

CLOSED-
acceptable action

Issue final rule.

08-15-03

11-21-03

P-03-02 issued
02-27-03

Carlsbad

Integrity Management

 

 

Develop the requirements necessary to ensure that pipeline operators’ internal corrosion control programs address the role of water and other contaminants in the corrosion process.

PHMSA published a final rule on gas integrity management that addresses the role of water and other contaminants in the internal corrosion process and the procedures for prevention, inspection, and repair. The rule requires operators using direct assessment to follow the requirement in standard ASME/ANSI B31.8S, Appendix SP-B2.

CLOSED
04-21-04

11-21-03

04-21-04

08-15-03

P-03-03 issued
02-27-03

Carlsbad

Pipeline Technology

 

(Internal Corrosion)

Evaluate OPS’s pipeline operator inspection program to identify deficiencies that resulted in the failure of inspectors before the Carlsbad, NM, accident to identify the inadequacies in the El Paso Natural Gas Company’s internal corrosion control program. Implement the changes necessary to ensure adequate assessments of pipeline operator safety programs.

CLOSED-
acceptable action

CLOSED – 8-21-05

08-21-05

08-15-03

11-21-03

P-04-07 issued 11/04/04

Glenpool

Emergency Response

Revise the emergency response planning requirements in the pipeline safety regulations to include coordination with electric and other utilities that may need to respond to a pipeline emergency.

CLOSED-
Acceptable
alternate
action

CLOSED
05-03-06

08-23-05

02-04-05

05-18-05

05-03-06

P-04-08

 

Issue an advisory bulletin to liquid pipeline operators to validate the accuracy of their tank strapping tables.

CLOSED-
Acceptable
alternate
action

Closed
05-18-05

05-18-05

 

P-07-01 issued 06/07/07 Emergency Response The NTSB recommends that the PHMSA provide a summary of the lesson learned from the Bergenfield, New Jersey accident to recipients of emergency planning and response grants CLOSED-
Acceptable
Closed
03-17-2008
03-17-08

06-29-07
06-07-07

11-20-07

P-98-25 issued
10-16-98

Tiger Pass

Damage Prevention

Outstanding . Require pipeline system operators to precisely locate and place permanent markers at sites where their gas and hazardous liquid pipelines cross navigable waterways.

CLOSED-
Acceptable
alternate
action

CLOSED
05-03-06

08-23-05

07-13-04

03-16-99

05-03-06

07-13-00

05-25-99

04-06-99

P-98-30 issued
11-18-98

Reedy River

Fatigue

 

(Controller

Shifts)

Outstanding . Assess the potential safety risks associated with rotating pipeline controller shifts and establish industry guidelines for the development and implementation of pipeline controller work schedules that reduce the likelihood of accidents attributable to fatigue.

CLOSED-
Acceptable
alternate
action

CLOSED
05-03-06

08-23-05

11-04-04

04-24-02

04-24-00

05-24-99

04-27-05

06-28-02

04-18-01

05-25-99

05-03-06